欧美中文字幕精品人妻,亚洲AV综合色区无码另类小说,无码人妻精品一区二区三区99不卡,久久国产精久久精产国

昆山達(dá)亮塑膠模具有限公司

Service phone:13962423309

Contact us

Bai Shui Chao           

Email: dl-bsc@dlsjmj.com 

Telephone:  13962423309 


Mark Yen              
Email: dl-mark@dlsjmj.com 
Telephone:  17312472090 


TEL:0512-57170368

FAX:0512-57170328

HTTP://www.ksdaliang.com

Add: No.218 South Yucheng  Road Kunshan City Jiangsu Province China.


Industry news Location:Index  >  News  >  Industry news

What should we pay attention to when making injection moulds?

Release date:2018-09-27 Click number:7998

First, we must look at the structural complexity of this mold. Generally speaking, it takes about a month to open a pair of injection moulds. Complex molds take longer time. Usually an injection mold is opened. It is necessary to have a detailed examination. After approval, the mold can be opened. After opening the injection mold, the mold needs to be tested. Injection molds need to manufacture the following items:

1. The cooling (water passage) in the mould is related to the size, shape, plasticity and holding time of the product.

2. The roughness of the die cavity should reach the "mirror level", otherwise the product is difficult to demould, and the product needs too much power when it pops up. The roughness of the locating pin, clamping surface and other parts is standard.

3. The plastic mold should have enough rigidity, otherwise it will deform when the mold is kept under pressure, which will lead to the selection of reasonable exhaust position and its control quantity. Otherwise, the plastic is not filled and the product is "missing".

4. The injection molding road should be reasonably selected so that the material evenly reaches each place (equal flow path), and there must be sufficient storage space to ensure that the plastic is added during shrinkage. Moreover, the shrinkage coefficient of each material is different, and the die has a reasonable shrinkage.

5. The fixing mode of the mold and the injection molding machine should be reasonable, reliable and firm, so as to prevent the accident caused by the displacement when the mold is closed. Disassembly is also very convenient. In addition, it is necessary to select a reasonable demoulding method, and choose the appropriate location and quantity of ejector pin to ensure that the product is not damaged during the ejection process.

Message

昆山達(dá)亮塑膠模具有限公司

13962423309

阿鲁科尔沁旗| 武义县| 镇巴县| 龙川县| 兴安县| 建阳市| 区。| 偏关县| 呼伦贝尔市| 邵东县| 武鸣县| 大渡口区| 金秀| 册亨县| 收藏| 察雅县| 安塞县| 杨浦区| 南宫市| 海口市| 南通市| 临夏县| 河池市| 台江县| 民乐县| 南安市| 贺兰县| 永昌县| 海兴县| 金山区| 奉贤区| 工布江达县| 连城县| 西乌珠穆沁旗| 九江市| 无极县| 锦屏县| 鄂尔多斯市| 威信县| 乌鲁木齐县| 延安市|