欧美中文字幕精品人妻,亚洲AV综合色区无码另类小说,无码人妻精品一区二区三区99不卡,久久国产精久久精产国

昆山達(dá)亮塑膠模具有限公司

Service phone:13962423309

Contact us

Bai Shui Chao           

Email: dl-bsc@dlsjmj.com 

Telephone:  13962423309 


Mark Yen              
Email: dl-mark@dlsjmj.com 
Telephone:  17312472090 


TEL:0512-57170368

FAX:0512-57170328

HTTP://www.ksdaliang.com

Add: No.218 South Yucheng  Road Kunshan City Jiangsu Province China.


Industry news Location:Index  >  News  >  Industry news

What are the five links of plastic mold

Release date:2021-01-04 Click number:7397

First, effective management of product data management, process data management, drawing document management: effective mold product data management, process data management, drawing document management, can ensure the comprehensiveness of the file, the consistency of the drawing version; so that the drawings can achieve effective sharing and effective query utilization. It can establish a complete file management computer database, and use the design drawings, scattered, scattered and isolated information accumulated by the design department, so as to prevent problems caused by 2D and 3D confusion, original, design change, maintenance version confusion, 3D model and 2D drawing data inconsistency, and 2D drawing design nonstandard and confusion Timely detection and correction, resulting in mold to modify and rework, or even void, increase the cost of mold manufacturing, lengthen the mold manufacturing production cycle, affect the delivery time.


Second, to maintain the consistency and integrity of plastic mold drawings, processing technology, and physical data: through effective, detailed, and strict testing means, to ensure the consistency and integrity of mold drawings, processing technology, and physical data.


Thirdly, the design and manufacturing cost of each set of plastic mold must be summarized in time: by effectively controlling the issuing of work summons in the workshop, the scrap of cutting tools can be effectively managed; Through accurate mold structure design, efficient mold parts processing and accurate spare parts detection, it will effectively reduce the additional cost of mold due to design change and maintenance, so as to obtain the actual cost of each set of mold and effectively control the mold quality.


Fourth, overall planning: the planning, design, processing technology, workshop production, human resources and other information are organically organized and integrated together for overall planning, so as to effectively coordinate the planning and production, and effectively ensure the quality of plastic mold and delivery on time.


Fifth, develop a complete and practical plastic mold production management system: develop a complete set of mold production management system, realize the mold production management process of product data management, process data management, plan management, progress management of computer information management system, including plastic mold production planning, mold design, process development, workshop task assignment and management Product inspection, warehouse management and so on, so that mold manufacturing and related auxiliary information from planning to delivery can achieve a full range of tracking management.


Message

昆山達(dá)亮塑膠模具有限公司

13962423309

西贡区| 南充市| 巫山县| 温州市| 尉犁县| 亳州市| 栾川县| 潞西市| 瓦房店市| 长垣县| 朔州市| 辽阳县| 龙岩市| 沈丘县| 筠连县| 英山县| 应城市| 吉林省| 航空| 略阳县| 米脂县| 临邑县| 七台河市| 甘孜| 蛟河市| 石嘴山市| 临沭县| 乌鲁木齐县| 大余县| 新蔡县| 紫阳县| 明水县| 昌邑市| 会泽县| 临海市| 大安市| 颍上县| 渑池县| 宜昌市| 宁都县| 淅川县|